Wondering if our GET Solar program is for you? Check out our case studies, testimonials, and more info from organizations who took charge and Galvanized their Own energy Transition (G.O.T Solar) through our Galvanizing our Energy Transition (G.E.T.) Solar technical assistance program! Check back often as we have more than 300 projects in our queue and many projects are in the final stages of signing contracts and going solar.

Bellefonte, PA (Centre County)
Date their solar array was completed: June 2025
Size of system: 791.5 kilowatts
Financing: The Centre County Recycling and Refuse Authority (CCRRA) was awarded a $75,000 grant from the West Penn Energy Fund (WPEF) to support its solar installation. Their solar system, which was installed over three separate CCRRA buildings, will offset more than 100% of the facility’s annual energy usage. CCRRA’s solar installer, Envinity, estimates the system will save the Authority nearly $2 million over the next 25 years.


East Vandergrift Borough, PA (Westmoreland County)
Date their solar array was completed: 2023
Size of system: 13 kilowatts
Financing: East Vandergrift Borough went solar with the help of a $48,000 grant from the Scott Electric Foundation and hired Paradise Energy Solutions to perform the installation. Located on the rooftop of their Borough building, their new solar array offsets 100 percent of the building’s energy usage.


Scranton, PA (Lackawanna County)
Date their solar array was completed: May 2025
Size of system: 8 kilowatts
Financing: NEPA Youth Shelter announced that it went solar in May 2025, hiring solar developer Endless Energy to perform the installation. Located on the rooftop of their shelter building, the new solar array offsets more than 90 percent of the building’s energy usage and will save the shelter about $80,000 over the next 25 years.


New Castle, PA (Lawrence County)
Date their solar array was completed: July 2025
Size of system: 545 kilowatts
Financing: New York Blower Company flipped the switch on its rooftop solar system in July 2025 with the help of solar developer EIS Solar. The company received a 30 percent solar tax credit to help reduce the cost of installation. Their solar array will go on to offset 100 percent of the facility’s energy usage.


Whitehall, PA (Allegheny County)
Date their solar array was completed: June 2025
Size of system: 22.2 kilowatts
Financing: Whitehall Borough announced the launch of its solar array on the rooftop of their EMS building in June 2025. The municipality went solar with the help of local solar developer Elysium Solar Energy. Their solar array will offset more than 90 percent of the facility’s energy usage. Elysium Solar Energy estimates the system will save the Borough nearly $100,000.00 over the next 25 years.
Testimonial: “Working with the PA Solar Center was an outstanding experience from start to finish. They made what initially seemed like a complex and overwhelming process feel simple and manageable. Their team was incredibly knowledgeable and streamlined our path to solar in Whitehall Borough.” – Whitehall Borough Staff


Indiana, PA (Indiana County)
Date their solar array was completed:
Size of system:
Financing:

Pittsburgh, PA (Allegheny County)
Date their solar array was completed: April 2024
Size of system: 50.6 kilowatts (offsets 12% of their Centre Avenue usage)
Financing: ACTION Housing received $20,000 from a private donor that included a corporate employer match in addition to receiving a 50% solar tax credit direct payment that included both the energy community and low-income community bonuses. The system was financed to be cash positive upon the first loan payment through the Bridgeway Capital Solar Loan Program.
Testimonial: “Working with PA Solar on the Centre Avenue Housing project has been crucial to getting this project completed! Leo, Jon and Amelia have been on our team since day one – analyzing the site, assisting with selecting a contractor and keeping us in the loop about the tax credit program roll outs. Without their assistance this project wouldn’t have been possible. We look forward to continue working with PA Solar to bring more solar panels to affordable housing projects throughout the region!” – Jodi Lincoln, Development Officer, Action Housing


New Castle, PA (Lawrence County)
Date their solar array was completed: January 2024
Size of system: 886 kW
Financing: Berner received a $537,000 Rural American Energy Program (REAP) grant through the USDA toward the cost of installation and benefitted from a 40% solar investment tax credit. The remainder was financed through an existing lender relationship.
The system is designed to cover all future energy expansion needs. Excess energy will initially be sent back to First Energy but will eventually be integral to a planned Berner facility expansion.
Testimonial: “The PA Solar Center has been a great partner and resource for our renewable energy sustainability journey. They were invaluable in guiding us about the technologies, funding opportunities, and processes needed to complete this project. Through their extensive network of connections, we were able to select the solar provider and project size that was best for us. They continued to support us throughout all stages of the project. Without their team’s helpful guidance, we would not have been able to take this leap forward to clean energy.” – Denise Grady, CFO, Berner International

Pittsburgh, PA (Allegheny County)
Date their solar array was completed: June 2024
Size of system: 200 kilowatts
Financing: Construction Junction (CJ) received a $245,000 grant from the Green Mountain Energy Sun Club, which covered a portion of the roof redevelopment and cost to install solar. The Bridgeway Capital Solar Loan Fund provided financing to cover the remainder while CJ waits for their 40% Direct Pay reimbursement from the IRS.
Testimonial: “Construction Junction has been pursuing a pathway to solar for more than a decade with no success; our partnership with PA Solar Center got us to our destination through expert and persistent navigation of solar providers, identifying critical grant funding, and providing helpful tips on project management that will enable CJ to power building material reuse and our expanded woodshop with the sun!” – Mike Gable, Executive Director, Construction Junction


New Kensington, PA (Westmoreland County)
Date their solar array was completed: February 2024
Size of system: 104.5 kilowatts
Financing: Wesley Family Services received a $170,720 grant from West Penn Power Sustainable Energy Fund, leaving only a nominal amount for Wesley to fund from its own budget. Additional financial support was provided by Collective Sun.
The 104.5kW solar energy system, installed by local developer EIS Solar, is estimated to produce about 110,800 kWh and reduce the facility’s utility bill by 78%. EIS estimates that the system will save the nonprofit a potential $700,000 over 25 years.

Pittsburgh, PA (Allegheny County)
Date their solar array was completed: April 2020
Size of system: 63.2 kilowatts
Financing: Global Links received a $150,000 grant from the Green Mountain Energy Sun Club, a nonprofit that helps organizations pursue projects that are environmentally friendly.
Global Links didn’t have to use any of its money for the project and will save between $12,000 to $15,000 per year in energy costs.
Testimonial: “We’re very excited because our 100-plus-panel solar array will cover about 82 percent of our energy usage. As a nonprofit, it’s extra exciting because we try to keep our costs low and we want to put all our donations toward helping the people we serve. When this opportunity came up with the PA Solar Center, we jumped at it.” – Angela Garcia, Executive Director, Global Links


McCandless Township, PA (Allegheny County)
Date their solar array was completed: March 2022
Size of system: 543 kilowatts
Financing: Thanks to a Power Purchase Agreement with developer BAI, the college did not have to spend any of its own money on the solar installation, which will save CCAC about $750,000 in energy costs over the next 28 years.
A Power Purchase Agreement is a tool often used by tax-exempt organizations to gain access to solar energy with little to no financing upfront. A third-party investor (in this case, BAI) owns and maintains the solar array and the host site (here, CCAC) pays for the energy generated by the solar system, typically at a significantly lower price than what the host was paying before.

Mill Run, PA (Fayette County)
Date their solar array was completed: February 2022
Size of system: The solar array consists of 540 individual panels that will annually produce 254,880 kilowatt hours of energy to offset the electric power supplied by West Penn Power. The array will also offset 25% of the overall facility’s electricity use.
Financing: The transition to renewable energy for Western Pennsylvania Conservancy’s Fallingwater property which is a world-renowned Frank Lloyd Wright-designed building was made possible through a power purchasing agreement with Ecogy Energy of Brooklyn, New York.
Testimonial: “In designing Fallingwater, Frank Lloyd Wright sought to create a harmonious relationship between architecture and nature. He was inspired by the natural features of the woodland landscape for the house’s colors, materials and design motifs, and oriented the building to take advantage of natural light and passive airflows. Installing solar carries forward Wright’s ideals and continues the Western Pennsylvania Conservancy’s commitment to protect and preserve this beautiful landscape and the architectural principles that make Fallingwater unique.” – Justin Gunther, Vice President and Director, Fallingwater

Coming soon — more organizations going solar, who are currently under construction! These include:
- Energy Innovation Center Pittsburgh
- Ghate Medical
- Indiana Wastewater Treatment Plant
- Nature’s Pantry
- Cambria Heights School District
Stay tuned…